Work shop calculation 2nd year MCQ-8 (Estimation and Costing)-2 Work shop calculation Welcome to your Work shop calculation 2nd year MCQ-8 (Estimation and Costing)-2 1.Which of the impurity in cast iron makes it hard and brittle? A : Silicon B : Sulphur C : Manganese D : Phosphorus 2.What cables are used for 132KV lines? A : High tension B : Super tension C : Extra high tension D : Extra super voltage 3.Which specification is other than general specification? A : Brief specification B : Bulk specification C : Detailed specification D : Main specification 4.What percentage of water absorbed by a good building stone? A : Less than 10% B : Less than 20% C : Less than 8% D : Less than 5% 5.What is the relative permittivity of rubber? A : Between 2 and 3 B : Between 5 and 6 C : Between 8 and 10 D : Between 12 and 14 6.What is the weight of the iron ball has volume of 250 cc and density 7.5 gm/cc? A : 1750 gram B : 1875 gram C : 1975 gram D : 1785 gram 7.What is the weight of a rectangular block of a cost iron of 250cm X 20cm X 8cm (density of cast iron is 7.8 gm/cm³)? A : 312 kg B : 372 kg C : 410 kg D : 525 kg 8.What is the total estimation cost for making the component of 8 drilled hole dia 10 mm and 4 Numbers of M6 taps in the plate, if Rs.8/- per drilled holes and Rs.12 per drill and tap? A : Rs.102 B : Rs.100 C : Rs.112 D : Rs.110 9.What is the total wattage in a room if 2 tube lights of 50W rating, 2 fans of 80W rating, 2 numbers of light points of 60W rating, one fan point of 60W rating and one 3 pin socket of 100W rating? A : 340 W B : 440 W C : 540 W D : 640 W 10.What is the total labour charges for a particular wiring work completed in 2 days by one electrician and one helper.(Electrician @ ₹800/day and helper @ ₹ 400/day) A : Rs. 2000 B : Rs. 2400 C : Rs. 3000 D : Rs. 1400 11.What is the total cost of painting of a class room including ceiling, if the size of length is 6m, breadth is 5m and height is 4m. (Painting + labour cost Rs.150/- per sq.m) A : Rs.15000/- B : Rs.16700/- C : Rs.17700/- D : Rs.18700/ 12.What is the total cost to assemble 10 personal computer systems, spares cost as given for one system: 1 TB hard disc Rs.4500/-, Intel i3 mother board Rs.7000/-, SMPS Rs.2500/-, monitor Rs.6000/-, keyboard Rs.1000/-, other material cost (Switches, USB, Cables etc.,) Rs.6500/-? A : Rs.275000/- B : Rs.250000/- C : Rs.225000/- D : Rs.265000/- 13.What is the total construction cost of a house construction area of 3000 sq.ft. (cost of construction Rs.2000/- per sq.ft including material and labour)? A : Rs.30,000,000 B : Rs.60,00,000 C : Rs.6,00,000 D : Rs.6,000,000 14.What is the total cost of Air-conditioners installed in a college, 40 class room-each 1 Airconditioner, Computer lab 5 Air- conditioners and conference hall 5 Air-conditioners (Cost of one air conditioner Rs.30000/- including installation)? A : Rs.10 lakhs B : Rs. 20 lakhs C : Rs. 12 lakhs D : Rs. 15 lakhs Time's up