weaving 39 ( WARP WINDING 1)

weaving 39 ( WARP WINDING 1)
spinning 46 (sizing process and chemical 3)
spinning 46 (sizing process and chemical 3)

Welcome to your weaving 39 ( WARP WINDING 1)

1 what is The change in twist of yarn during over end unwinding ?

2 when the efficiency of the above machine is 91%, additional time(min) required to do the same job is approximately?

3.Wind is wind?  

4  what is mean A 2.5 crossing drum

5.which parameter pacakgr density independent "  

6.when Hardness of a cone can be changed if changing ?

7. when surface driven winding package, as the winding proceeds , angle of wind is ?

8 what is occur during Pattern formation drum driven winding

9 which process convert the yarn into cone?

10 Which factor affect the yarn structure during winding?

11.Which process have basic function to convert large package to small ring bobbine?

12.What is yarn clearing?

13. What is object of winding?

14.Which process is used for waxing of yarn?

15.Which part of machine used to checkionfg and removing yarn faults?

16.Which part of machine used for removing broken and cut yarn?

17.What is the function of tensioner?

18.Which part of machine is highly responcible for damage the yarn?

19.How many types of methods by which tension applied to yarn?

Leave a Reply

Your email address will not be published. Required fields are marked *